This project is a preparation of Cote d’Ivoire for CAN2021 (Cup of African Nations 2021 year). It is a Government level project and this Olympic Village in Abidjan must be ready for competition. Project consist of 32 objects, total land size is 287 hectares. The preliminary budget of the project is 2.05 billion Euro. The financial plan assumes a loan reimbursement maturity of 25 years and a borrowing interest rate of 3%. The stage of approval of the Master Plan was completed and a preliminary draft project was completed. The construction of the Olympic Stadium is funded through China Eximbank loan. Other elements of the village will be funded through private investments, public procurement, BOO and BOT. Bird’s eye view:
Master Plan here:
Preliminary Design + Final Master Plan with m2
Opportunities: PPP, BOOT, BOO, DBFO, DBOOT, Design, Construction, Investments, Business, Finance, Operation and Management.
Some objects already arranged to the Partner