Cote d’Ivoire – Olympic Village Ebimpe, Abidjan

This project is a preparation of Cote d’Ivoire for CAN2021 (Cup of African Nations 2021 year). It is a Government level project and this Olympic Village in Abidjan must be ready for competition. Project consist of 32 objects, total land size is 287 hectares. The preliminary budget of the project is 2.05 billion Euro. The financial plan assumes a loan reimbursement maturity of 25 years and a borrowing interest rate of 3%. The stage of approval of the Master Plan was completed and a preliminary draft project was completed. The construction of the Olympic Stadium is funded through China Eximbank loan. Other elements of the village will be funded through private investments, public procurement, BOO and BOT. Bird’s eye view:

Master Plan here:

Preliminary Design + Final Master Plan with m2

Opportunities: PPP, BOOT, BOO, DBFO, DBOOT, Design, Construction, Investments, Business,  Finance, Operation and Management.

Some objects already arranged to the Partner

Expansion of Port in San Pedro

It is require to build additional Terminal and make total Port Expansion. There are 150 Hectars of the land can be used for. Looking for PPP(BOOT, BOO) partnership to take operation and management of new terminals. Total project cost is 137,5 mln Euro. Some details:

Terminal polyvalent commercial au port de San Pedro 7,5M

Viabilisation port autonom de San Pedro 130M

Opportunities: PPP, BOOT, BOO, DBFO, DBOOT, Design, Construction, Investments, Business,  Finance, Operation and Management

Peru – new district

Project: »Ancon« (Ancon district)
Type: Private – Public
Cost: 1st infrastructure faze = US$ 200m
Description: The Ecological city of Ancon is to be built cca. 50km to the north of city center of Lima.
In case of »Ancon« city only the first faze of building infrastructure on first
400ha(14.000 housing units) of the terrain of alltogether 3000ha(50.000
housing units) is worth US$ 500m.

Opportunities: PPP, Design, Construction, Financing, Business, Operation, Management