Kazakhstan – Two new railway lines (Zhezkazgan – Saksaulsk and Arkalyk – Shubarkol), 760 km

Картинки по запросу назарбаев нурсултан абишевич принимает железную дорогу Жезказган - саксаульск  аркалык - шубарколь
A train that leaves on a new branch of the railway

The project of national importance, approved by the President of the Republic of Kazakhstan Nursultan Abishevich Nazarbayev in the state Development Strategy of Kazakhstan for 2030-2050. Throughout the length of the new railway, unbearable working conditions, since in this region the temperature varies from -45 in winter to +45 in summer. Communication systems are made at the highest technological level. They participated in the project as a Subcontractor of ZTE Corporation. The contract holder was a subsidiary of Intec Trade Kazakhstan LLP. The total project cost is about 2 bln Euro. The implementation period is 2012-2014.

http://www.inconkz.com/en/pressa-o-nas/item/60-v-kazakhstane-zapushchen-poezd-zhezkazgan-saksaulsk-kyzylorda

Leave a Reply

Your email address will not be published. Required fields are marked *