Kazakhstan – Gas Pipeline between China and Uzbekistan, 1310 km

Картинки по запросу назарбаев и лидер КНР
The grand opening of the gas pipeline by the Presidents of the Republic of Kazakhstan and China

The project of national importance, approved by the President of the Republic of Kazakhstan Nursultan Abishevich Nazarbayev in the state Development Strategy of Kazakhstan for 2030-2050. Over a length of 1310 km, 62 compressor and crane units were built, fully equipped with equipment for remote monitoring and control. At present, 3 gas pipeline branches have been commissioned. Over the course of 3 years, performance support and equipment maintenance have been carried out. In the implementation of the project, they participated in the role of Subcontractor Huawei Technologies. The contract holder was a subsidiary of Intec Trade Kazakhstan LLC. The implementation period is 2011-2016.

http://www.agp.com.kz/?page_id=4048

Leave a Reply

Your email address will not be published. Required fields are marked *