Kazakhstan – SEZ “Chemical Park” Taraz “

Bird-eye view on the facility

The project of national importance, approved by the President of the Republic of Kazakhstan Nursultan Abishevich Nazarbayev in the state Development Strategy of Kazakhstan for 2030-2050. As part of the project, a railroad, gas pipeline, oil pipeline, and high-voltage power line were built on a specially designated area to accommodate the production capacities of the chemical industry. The area of ​​Chemical Park is 505 hectares. The project also included the arrangement of the common territory of the Chemical Park, protective zones, access roads, installation of communication systems and security monitoring. In the implementation of the project, they participated in the role of a subcontractor of ISSEngineering LLP. The contract holder was a subsidiary of Intec Trade Kazakhstan LLP. The estimated cost of the project is 1.4 billion Euros. The implementation period is 2013-2019.

https://sk.kz/press-centre/news/2690/

Leave a Reply

Your email address will not be published. Required fields are marked *