Georgia – Low Sulphur Marine Fuel Oil(LSMFO) Refinery on the Black Sea

First Low Sulphur Marine Fuel Oil(LSMFO) hub on the Black Sea will serve the demands of the local and foreign customers. The facility will have the capacity to process 30.000 barrels of crude oil per day but can be increased in line with market needs. Evolve Trade and Investment Ltd is our partner in this project, which is delivering cutting edge technology and UK government agencies support. This project will make a huge socio-economic difference to Georgia with the creation of hundreds of jobs and will send a strong message to the world and its leaders that Georgia is ready to embrace the goals set by the Paris agreement on climate change.

https://cbw.ge/economy/oil-refinery-factory-to-be-built-in-georgia

Cote d’Ivoire – Olympic Village Ebimpe, Abidjan

This project is a preparation of Cote d’Ivoire for CAN2023 (Cup of African Nations 2023 year). It is a Government level project and this Olympic Village in Abidjan must be ready for competition. Project consist of 32 objects, total land size is 287 hectares. The preliminary budget of the project is 2.05 billion Euro. The financial plan assumes a loan reimbursement maturity of 25 years and a borrowing interest rate of 3%. The stage of approval of the Master Plan was completed and a preliminary draft project was completed. The construction of the Olympic Stadium is funded through China Eximbank loan. Other elements of the village will be funded through private investments, public procurement, BOO and BOT. Bird’s eye view:

Master Plan here:

Preliminary Design + Final Master Plan with m2

Opportunities: PPP, BOOT, BOO, DBFO, DBOOT, Design, Construction, Investments, Business,  Finance, Operation and Management.

Some objects already arranged to the Partner

Dam and Hydroelectric Plant in Benin

This is a strategic project of the state to develop the central part of the country. The total cost of 1 billion dollars, the implementation period is 15 years +. It is assumed that the erected dam will create great opportunities for other sectors of the economy, respectively, the state is ready to give guarantees and all that is needed. The project is either EPC or BOT – you have to discuss the specific conditions directly in Benin. Below, click on the link for more details:

Barrage + HPP Rapport_hydroélectrique-finale_abz_30-04-2018

Design, Construction, PPP, BOO, BOT, Investment, Financing, Operation, Maintenance

Expansion of Port in San Pedro

It is require to build additional Terminal and make total Port Expansion. There are 150 Hectars of the land can be used for. Looking for PPP(BOOT, BOO) partnership to take operation and management of new terminals. Total project cost is 137,5 mln Euro. Some details:

Terminal polyvalent commercial au port de San Pedro 7,5M

Viabilisation port autonom de San Pedro 130M

Opportunities: PPP, BOOT, BOO, DBFO, DBOOT, Design, Construction, Investments, Business,  Finance, Operation and Management

Expanding Peru

Our delegation visited Peru for Road project Development. Pedro Pablo Kuczynski Godard was very kind to meet with our representatives and express his view regarding our Colaboration. Next visit scheduled October 23, 2017.

Opportunities: PPP, Design, Construction, Financing, Business, Operation, Management