Georgia – Low Sulphur Marine Fuel Oil(LSMFO) Refinery on the Black Sea

First Low Sulphur Marine Fuel Oil(LSMFO) hub on the Black Sea will serve the demands of the local and foreign customers. The facility will have the capacity to process 30.000 barrels of crude oil per day but can be increased in line with market needs. Evolve Trade and Investment Ltd is our partner in this project, which is delivering cutting edge technology and UK government agencies support. This project will make a huge socio-economic difference to Georgia with the creation of hundreds of jobs and will send a strong message to the world and its leaders that Georgia is ready to embrace the goals set by the Paris agreement on climate change.

https://cbw.ge/economy/oil-refinery-factory-to-be-built-in-georgia

Cote d’Ivoire – Olympic Village Ebimpe, Abidjan

This project is a preparation of Cote d’Ivoire for CAN2023 (Cup of African Nations 2023 year). It is a Government level project and this Olympic Village in Abidjan must be ready for competition. Project consist of 32 objects, total land size is 287 hectares. The preliminary budget of the project is 2.05 billion Euro. The financial plan assumes a loan reimbursement maturity of 25 years and a borrowing interest rate of 3%. The stage of approval of the Master Plan was completed and a preliminary draft project was completed. The construction of the Olympic Stadium is funded through China Eximbank loan. Other elements of the village will be funded through private investments, public procurement, BOO and BOT. Bird’s eye view:

Master Plan here:

Preliminary Design + Final Master Plan with m2

Opportunities: PPP, BOOT, BOO, DBFO, DBOOT, Design, Construction, Investments, Business,  Finance, Operation and Management.

Some objects already arranged to the Partner

Kazakhstan – SEZ “Chemical Park” Taraz “

Bird-eye view on the facility

The project of national importance, approved by the President of the Republic of Kazakhstan Nursultan Abishevich Nazarbayev in the state Development Strategy of Kazakhstan for 2030-2050. As part of the project, a railroad, gas pipeline, oil pipeline, and high-voltage power line were built on a specially designated area to accommodate the production capacities of the chemical industry. The area of ​​Chemical Park is 505 hectares. The project also included the arrangement of the common territory of the Chemical Park, protective zones, access roads, installation of communication systems and security monitoring. In the implementation of the project, they participated in the role of a subcontractor of ISSEngineering LLP. The contract holder was a subsidiary of Intec Trade Kazakhstan LLP. The estimated cost of the project is 1.4 billion Euros. The implementation period is 2013-2019.

https://sk.kz/press-centre/news/2690/

Kazakhstan – First in CIS 4G LTE network for CJSC ALTEL

Construction of the first 4G LTE network in the CIS for Altel CJSC (Subsidiary of Kazakhtelecom JSC). The project of national importance, approved by the President of the Republic of Kazakhstan Nursultan Abishevich Nazarbayev in the state Development Strategy of Kazakhstan for 2030-2050. The number of Base Stations is more than 6000, FOCL and RRL equipment, as well as turnkey telecommunication towers, masts, and containers. The project was implemented in collaboration with the manufacturer Huawei Technologies. Wireless Internet speed reached 75 Mb/s on subscribers. In this project, our subsidiary Intec Trade Kazakhstan LLC was used for contractual relations. The project cost 700 million Euros. The implementation period is 2012-2017.

https://telecom.kz/en/news/view/14259

Dam and Hydroelectric Plant in Benin

This is a strategic project of the state to develop the central part of the country. The total cost of 1 billion dollars, the implementation period is 15 years +. It is assumed that the erected dam will create great opportunities for other sectors of the economy, respectively, the state is ready to give guarantees and all that is needed. The project is either EPC or BOT – you have to discuss the specific conditions directly in Benin. Below, click on the link for more details:

Barrage + HPP Rapport_hydroélectrique-finale_abz_30-04-2018

Design, Construction, PPP, BOO, BOT, Investment, Financing, Operation, Maintenance

Guinea Conakry – Construction of 50 000 houses

This project is the state program of the Republic of Guinea for the construction of housing for social workers. The project form is PPP. The total cost is 1.9 billion dollars. To implement the program, the state gives 16,600 hectares of land and guarantees the funds invested by the investor. Details under the link below:

50000 SOCIAL & HIGH STANDING HOUSING PROJECT (Guinea) (2)

Design, Construction, PPP, Investment, Financing, Business

Construction of houses 1380 pcs

The project of building houses for civil servants is a good opportunity for Construction company enter the market and immediately earn money. This project is part of the social program of the Republic of Cote d’Ivoire, which provides for the construction of 60,000 new homes per year for the next 10 years. This is the first stage of the project, which is only 1380 houses. The total project price is 44 301 481,80 €, NPV = 12 193 455,28 €, IRR = 53.34%, Implementation term is 1,5 years.

Continue reading “Construction of houses 1380 pcs”

Cote d’Ivoire – Power Transmission and Distribution

Cote d’Ivoire currently have a huge amount of works in Power Transmission and Distribution sector. There are two big national wide projects already approved for investment and now require only Implementation Subcontractor. One of them financed by World Bank another one by African Development Bank Group. Credit Lines opened to local Electricity company – CI Energies. Tenders already opened for attendance. Please analyze attached documents:

Cote_dIvoire__AR-_Power_Transmission_and_Distribution_Networks_Reinforce…

WB COTE-DIVOIRE-PAD-03132017

Opportunities: Design and Construction