Ukraine – Low Sulphur Marine Fuel Oil Refinery on the Black Sea(LSMFO)

First Low Sulphur Marine Fuel Oil (LSMFO) hub on the Black Sea will serve the demands of the local and foreign customers. The facility will have the capacity to process 30.000 barrels of crude oil per day but can be increased in line with market needs. Evolve Trade and Investment Ltd is our partner in this project, which is delivering cutting edge technology and UK government agencies support. This project will make a huge socio-economic difference to Ukraine with the creation of thousands of jobs and will send a strong message to the world and its leaders that Ukraine is an attractive location for long term investments.

Ukraine – Creating the first Domestic Waste to Energy factory in Dnipropetrovsk region

Waste Recycling

The technology we are going to use allows the landfill to be reduced, electricity and carbon char to be produced. Mixed domestic waste, Food waste, Bone meal, Clinical waste, Sewage sludge, Tyres, Hoses, Automotive Residues, Waste landfill, Mangroves remediation and Construction waste are suitable for recycling. We are going to set up cooperation on some sort of PPP(Public-Private Partnership) basis. For sure, this technology will make a huge socio-economic difference to Ukraine with the creation of hundreds of jobs and will send a strong message to the world and its leaders that Ukraine is ready to embrace the goals set by the Paris agreement on climate change by utilizing domestic waste of Dnipropetrovsk city into electricity and carbon char.

Dam and Hydroelectric Plant in Benin

This is a strategic project of the state to develop the central part of the country. The total cost of 1 billion dollars, the implementation period is 15 years +. It is assumed that the erected dam will create great opportunities for other sectors of the economy, respectively, the state is ready to give guarantees and all that is needed. The project is either EPC or BOT – you have to discuss the specific conditions directly in Benin. Below, click on the link for more details:

Barrage + HPP Rapport_hydroélectrique-finale_abz_30-04-2018

Design, Construction, PPP, BOO, BOT, Investment, Financing, Operation, Maintenance

Guinea Conakry – Construction of 50 000 houses

This project is the state program of the Republic of Guinea for the construction of housing for social workers. The project form is PPP. The total cost is 1.9 billion dollars. To implement the program, the state gives 16,600 hectares of land and guarantees the funds invested by the investor. Details under the link below:

50000 SOCIAL & HIGH STANDING HOUSING PROJECT (Guinea) (2)

Design, Construction, PPP, Investment, Financing, Business

Ghana – Gold Mine

This project is a Gold mine development in Ghana. Company already registered and have all necessary licenses and permissions including 2 pieces of land for mining. Earning of gold is already on-going, but with a small volumes. Neighbors are the industry leaders of the world. Project require Investments. High quality Business plan from french company prepared.

Forcasted IRR = 40,55%, NPV = 29 064 650 USD

More details with below link:

Presentation_Ghana_Mining_Nov_2017.pdf

Cote d’Ivoire – Roads

There are a lot of roads under discussion now. Details below:

Abidjan Reconstruction: COTE_D_IVOIRE_-_AR_-_Abidjan_Urban_Transport_Project

Other roads:

ROUTE- A Abengourou ROUTE- Abidjan San Pedro ROUTE- Daoukro Agnibilikro ROUTE- Dianra Boundiali ROUTE- renforcement 3916 km ROUTE- renforcement ok ROUTE- S Man ROUTE- Sanssandra Lakota ROUTE- Sassandra Gagnoa ROUTE- T – Beoumi ROUTE- voirie ROUTE- Yamoussoukro Bouake

Opportunities: Design, Construction, Investment

Cote d’Ivoire – Biomass Power Plant

It is signed agreement with the Government of the Republic of Cote d’Ivoire to Build, Operate, Own (BOO) a 25 MW Biomass(cotton) power plant.

The electricity generated will be purchased by the National Electricity Company under a 20-year PPA(signed). Project cost 36 mln $, IRR 21%.

Opportunities: Design, Investment, Construction, Financing.

Benin – SOLAR Power Plant

It is signed agreement with the Government of the Republic of Benin to Build, Own, Operate(BOO) SOLAR Power Plant. First stage is 10.8 MW expandable to 21.6 MW connected to the electricity grid of Societé Beninoise d’Energie Electrique (SBEE) in Sakété.

The electricity generated will be purchased by the SBEE ( National Electricity Company )  under a 20-year PPA(signed).

Project cost 21 mln $, IRR 28%.

Opportunities: Investment, Construction, Operation